#151
| ||||
| ||||
| Yeah, i couldn't agree more. I didn't see much potential, but it looks like this ride could just be a lot of fun. I also like the non-inverted loop, the second drop (the one right after the 1st brake run) and the (what is that 400 degree?) helix through the building right after. Thanks for that link to the helicopter shot Johnny! It really puts the size of this thing into perspective. |
|
#152
| ||||
| ||||
|
Has anyone else seen the rumour on Screamscape about the tower being installed wrong adn will have to be torn down and rebuilt or whatever? Is this just a bad april fools joke? I hope so cause I want to ride it in june!
|
|
#153
| ||||
| ||||
|
I read that. It could be a joke but it's not the first time we saw alterations.
__________________ Thrillnetwork Moderator - Sophomore Original sn: CHILLERLC1 2008 & 2009 TN Coaster Draft Champion You knew I wanted the other repeat too |
|
#154
| ||||
| ||||
|
Word on the street is that this is the lemon of 2009. I really wanted to give Maurer Sohne a chance, but man, it really is a bummer when some of these smaller companies can't pull through. I mean, a lift hill? Why would you say you can sell something if you clearly can't deliver it? And they already re-designed a support, something you rarely see other companies do with their rides (B&M). I hope it the best, maybe it'll open before July? |
|
#155
| ||||
| ||||
|
Weren't we all right in wishing first for the B&M Hollywood Dream coaster they got in Japan? I was thinking of the sheer size of the lifthill support footer patch if they screwed up that badly, how deep it is. I wonder structurally if it could reengineered with supports and track. A hard one to get around is clearance from the station to the lift and radius of track going to pure vertical. If it's really true could it be done by the time I plan to go in October or will it delay til next year to open with Harry Pothead Land?
__________________ Thrillnetwork Moderator - Sophomore Original sn: CHILLERLC1 2008 & 2009 TN Coaster Draft Champion You knew I wanted the other repeat too Last edited by Leo C; 04-02-2009 at 03:53 PM. |
|
#156
| ||||
| ||||
|
Has anyone heard what is going on with the coaster
__________________ Manta roller coaster 2009 |
|
#157
| ||||
| ||||
|
Last I heard the station was nearing completion but the lifthill still was no where to be seen.
|
|
#158
| ||||
| ||||
|
Only the station. I expected more progress.
__________________ Thrillnetwork Moderator - Sophomore Original sn: CHILLERLC1 2008 & 2009 TN Coaster Draft Champion You knew I wanted the other repeat too |
|
#160
| ||||
| ||||
|
There have been a couple of bad spots that needed fixing.. Anyway, there is some speculation around the internet that there are problems with construction.. My guess is simply all the track has not arrived yet. From the road it looks like not all the track is there which is why the lift was not completed. They are currently working the remaining 5 or so pieces of track that connect the end of the ride to the station. There is still alot of work happening with the station house and stuff like brake runs, exit stairs. Anyway some new photos are here... Johnnyupsidedown.com Rockit Photos
__________________ Johnny Upsidedown's Roller Coaster Website www.Johnnyupsidedown.com Stop by and take a look at lots of coaster photos, construction and trip reports. |
|
#161
| ||||
| ||||
|
There's a weird rumor of recycling Maverick's unused roll, the fail roll (for too many G's during testing), for the lift hill.
__________________ Thrillnetwork Moderator - Sophomore Original sn: CHILLERLC1 2008 & 2009 TN Coaster Draft Champion You knew I wanted the other repeat too |
|
#162
| ||||
| ||||
| Quote:
Leo, can you elaborate on that rumor? I just cant see that being true in any way since it's two different companies and two different track types.
__________________ ThrillNetwork Moderator The user formerly known as WildeFyre UOIT Mechanical Engineering Student |
|
#163
| ||||
| ||||
|
Say, I could have sworn I read that the track was going to ride over the water on the city walk pond. From the photos I've seen, it does'nt look like thats going to happen. Anyone else remember this? |
|
#164
| |||
| |||
|
Maurer Sohne has built more complicated lift hills then this. The problem is likely from construction or a problem that came out of shipping.
__________________ Michael C |
|
#165
| ||||
| ||||
|
Just a rumor on the twist up the lift hill. No real proof. It's probably a joke another site is playing. On the lift hill, if it's really screwed up it could be the contractor that did the installation not the designer as Ryan suggests.
__________________ Thrillnetwork Moderator - Sophomore Original sn: CHILLERLC1 2008 & 2009 TN Coaster Draft Champion You knew I wanted the other repeat too Last edited by Leo C; 04-11-2009 at 05:14 PM. |
|
#166
| ||||
| ||||
|
The firehouse clearance issue was fixed. The track now freely flows through that. Nothing else really on the lift.
__________________ Thrillnetwork Moderator - Sophomore Original sn: CHILLERLC1 2008 & 2009 TN Coaster Draft Champion You knew I wanted the other repeat too |
|
#167
| ||||
| ||||
|
It was probably not Maurer's fault. I wouldn't consider them to be a smaller company, as they have many coasters all over the world, many of them are very one of a kind. Keep in mind they are the ones who built all of those sky wheel coasters.
|
|
#168
| ||||
| ||||
|
The back of the fire house still needs to be fixed. Lift work was getting done today not track but all the other stuff like electricall, and standing platforms with rails. I would imagine the lift will get done in the next week or so. The remaining track has been moved to the front of the storage area so looks like it might be ready to go. Got some cool photos today as the far end where the firhouse is was open so got some cool photos from the end. Tons of other work getting done with exit stairs, brake run plate forms and some dirt work gettting done in the front area. Anyway things are moving along pretty well, as there is a lot of work getting done around the site.. Lots of photos from today are here.. Johnnyupsidedown.com Rip Rockit Photos Here is a back end shot...
__________________ Johnny Upsidedown's Roller Coaster Website www.Johnnyupsidedown.com Stop by and take a look at lots of coaster photos, construction and trip reports. |
|
#169
| ||||
| ||||
|
Now that all the track is in place, I can't wait to see it testing in the next few weeks or a month.
__________________ Dirty Tramp |
|
#170
| |||
| |||
|
I think we will see the coaster tested sooner then later. busy summer season is coming up fast.
__________________ Michael C |
|
#171
| ||||
| ||||
|
The track isn't all in place yet, the lift still hasn't been finished as far as I know.
|
|
#172
| ||||
| ||||
|
I doubt they're going to make Memorial Day at this rate, and then Manta will steal the show. This does look like a good coaster though. Very twisted track layout and a lot of good airtime too. |
|
#173
| ||||
| ||||
| Quote:
Quote:
The lift hill isn't the ONLY thing that's gone wrong when it comes to the installation of this ride and for whatever reason you don't want to point the finger at Maurer Sohne even though they've previously made 2 very simple (and not typical) design errors. You're claiming it just happens to be a coincidence, and I'm claiming it's not. How bout this, I'll blame the company that designed the ride (Maurer Sohne) based on the fact that they've made 2 previous brain fart mistakes until there's some kind (any kind) of evidence that the construction company contributed to the problem. Sounds fair to me. |
|
#174
| ||||
| ||||
|
I was only talking about the lift hill problem, I didn't even bring the others up. The other clearance problems like the firehouse could very well be, and probably was, Maurer Shone's fault. All I was trying to say was that if there was an issue such as the track not lining up with the supports, it very well could have been caused by the construction company. They could have easily placed the support structure an inch off mark. I'm not saying they did, I'm just saying it's possible.
__________________ ThrillNetwork Moderator The user formerly known as WildeFyre UOIT Mechanical Engineering Student |
|
#175
| ||||
| ||||
|
^Well, its irrelevant anyway cause the rides been topped off... Photo courtesy of HatetoFLY over at TPR ![]() 1. It looks great! 2. Its about time! |
|
#176
| ||||
| ||||
|
That hill is kinda a let down... I was expecting a beyond vertical one...
__________________ It's Christmas in the Smokies! And Christmas in the Smokies is where I belong! Smoky Mountain Christmas Only At Dollywood (Nov.7-Jan. 2) |
|
#177
| ||||
| ||||
|
Finished FINALLY!
__________________ INTIMIDATOR | INTIMIDATOR305 -2010- |
|
#178
| ||||
| ||||
| Quote:
And steeper drops don't always guarantee more airtime. |
|
#179
| ||||
| ||||
|
It is still a steep drop. Any guesses on the angle of it? And I wonder if the second drop after the first MCBR is any steeper.
__________________ Dirty Tramp |
|
#180
| |||
| |||
|
I believe the first drop is *67 degrees I have no idea about the first drop off the first MCBR. It looks even steeper then the first drop which kinda had me alittle worry about the pacing of this ride especially in that area. Is the train going to have to come to a damn near complete stop or is there going to be EJECTOR airtime I can't wait to see how this turns out. I'm really hoping for these MCBRs to be used as more speed/block checks instead of trims since theres so many of them. Anyways can't wait till this thing opens I already have my 2 park 7-day ticket just taunting me hurry up HRRR
|
![]() |
| Bookmarks |
| Tags |
| 2009, construction, universal |
| Thread Tools | |
| Display Modes | |
| |
| © 2001-2009 ThrillNetwork, LLC. All rights reserved. About Us - Terms of Use - Privacy Policy - Contact Us |
Powered by: vBulletin Version 3.8.4 - Copyright © 2000-2009, Jelsoft Enterprises Ltd. SEO by vBSEO 3.3.2 |